C
GB
Make a Ø 80mm hole, as required.
E
Open a pre-punched hole for the
pipe passage (work from outside).
Fit the seal delivered with the device around the
edge of the hole used for the cable feed-through
(cable protection).
G
Wall installation
Use rawl plugs suitable to the wall consistence and four
threaded bars of suitable length.
I
the electrical and hydraulic connections
according to the indications given in paragraph 4.
3.4 - CEILING INSTALLATION
A
The unit can be connected in four different directions:
- top right side, top left side,
- right vertical wall side, left vertical wall side.
5
5 / 10 mm
20 - 40 mm
Carry out
D
Remove the return air grille releasing it from the side guides
and the central elastic stop.
F
Fix the side brackets
by means of the bolts supplied in the kit.
H
Fix the unit against the wall.
J
Fix both the side panels and
reassemble the return air
grille.
B
Place the fullscale diagram and mark the holes to drill
(pipes on vertical wall or under-ceiling, condensate drain
pipe, brackets).