Descargar Imprimir esta página

Louisville AA2210R5 Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 2: PERMANENT INSTALLATION
A. The ladder comes with pre–drilled holes for permanent installation at locations shown in
Figure 8. Shim, when necessary to fill space between ladder frame and rough opening, at
pre–drilled locations. Using 3/16" drill bit, drill 3" deep pilot holes through shim and into
ceiling joists and header.
B. Install the ten 3" lag screws provided, at each location to permanently secure the ladder. Tighten
until head is snug against frame. Do not overtighten, or damage could occur.
C. WARNING: Never use deck or sheetrock screws in place of lag screws for
permanent installation.
D. Remove temporary boards from ceiling installed in step 1.
FIGURE 9
6
FIGURE 8: Aluminum and Wood series
STEP 3: ADJUST LADDER LENGTH
Remove plastic straps holding the sections together and carefully
unfold ladder to the ground rotating bottom section behind
middle section (Figure 9).
WOOD MODELS ONLY:
(Aluminum models: skip to next section on page 8)
A. Press down on top and middle sections of the ladder to
ensure the power arms are fully extended before taking
measurements for trimming your ladder

Publicidad

loading

Este manual también es adecuado para:

Aa2510r5Wa2210l