Aqua Marina Vibrant BT-18VI Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTRUCTION FOR ASSEMBLING AND DISASSEMBLING
A
Unfold the board from the packaging box
Choose a smooth and clean surface to unfold your board.
B
Side fin installation
Before inflation, insert two side fins first (Breeze, Vapor, Super Trip)
Slide-in center fin installation
Once the board is inflated, slide in the large Center Fin to the fin base and insert the push-in pin.
C
Inflation
1. Attach the pressure gauge and the pump hose to the gauge housing on the pump and secure it
tightly.
2. Unscrew the valve cap, push button in and turn it clockwise to make sure that the valve is in the
"Pin Out" position.
3. Start pumping air into the board by sliding the pump piston up and down, inflate until you reach the
required pressure.
TIP: If the pump piston starts to squeak, apply some spray silicone on the piston shaft.
MINIMUM 12PSI FOR PROPER ISUP (EXCEPT MEGA) OPERATION AND
MAXIMUM OF 15PSI. DO NOT OVER INFLATE BEYOND 15PSI (8PSI FOR MEGA,
18PSI FOR RAPID). THIS WILL VOID YOUR WARRANTY.
Before inflation
After inflation
7

Publicidad

Tabla de contenido
loading

Tabla de contenido