9. Fit the product with the bottom insulation and secure it with a washer and
a nut.
10.Connect the pipes of the heating circuit to the connections of the fittings
(no mechanical stress).
11.Fit the upper insulation.
Mounting
1. Remove the upper insulation.
2. Hold the product to the wall and
3. Draw six marks.
4. Interconnect the opposing marks.
5. Drill holes (Ø 10 mm) at the posi-
6. Insert the enclosed dowels.
7. Screw the long hanger bolt into
8. Screw the short hanger bolt into
FA PG - 06/2019 - 008.15 442 99_02 - EN
align it with a level.
tion of the two centre marks.
the top hole.
the bottom hole.
EN
19