Sunbeam heated bedding Manual Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Heated Throw Setup
When setting up your heated throw, be sure to follow the steps below in order.
1 Locate the heated throw's information label near the module.
2 Connect the cord into the module at the bottom of the heated throw until
the plastic hinges click into place. CAUTION: Cord must be COMPLETELY CONNECTED. A risk of fire
could result from a loose connection.
3 Plug the [heated throw] power cord into a 110-120 volt wall outlet.
CAUTION: Do not plug main power cord into the wall outlet until you have completely set up your heated
product per the instructions.
• Disconnect power cord from wall before detaching control from heated product.
• Always make sure cords and controls are NOT trapped or pinched between bed slats, mattress,
springs, against wall, foot board or bed frame, or between furniture, walls or chairs.
• Do not wrap control in throw when in use.
• Do not use with generator power.
Using Your Heated throw Control:
1 To turn on the throw press the button in the middle of the control.
The indicator light will glow, depending on which setting the heated
throw is set, and the heated throw will begin to warm.
CAUTION: ALWAYS turn the heated throw "OFF" and disconnect the
power cord from the outlet when not in use.
2 To turn the heated throw OFF press the button through the different
settings until the temperature setting lights are not glowing.
3
E10
For questions or support, please visit www.sunbeambedding.com.
Sunbeam HeatedBedding IB_17ESM1.indd 10
Flag Tag
Control
Power
Cord
1
2
Label
Module
Throw Cord
Throw Cord
Connector
If there is a flashing light
on your control, see page 13.
3
Flag Tag
Control
Power
Cord
1
2
Label
Module
Throw Cord
Connector
Throw Cord
2/3/17 09:09

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido