Descargar Imprimir esta página

Pentair RAYCHEM JBM-100-A Instrucciones De Instalación página 4

Ocultar thumbs Ver también para RAYCHEM JBM-100-A:

Publicidad

Idiomas disponibles

Idiomas disponibles

5B
• Push braid back to
create a pucker.
• At pucker use a screwdriver
to open braid.
• Bend heating cable and
work it through opening
in braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Cut and remove
all fiber strands.
• Score and remove
center spacer.
• Remove any remaining
fiber material from bus
wires.
• Pull braid tight to make pigtail.
INDUSTRIAL HEAT TRACING SOLUTIONS
XTV, KTV
6 1/2 in
(165 mm)
Go to Step 6
Raychem-IM-H56344-JBM100A100A6-EN-1610
5C
• Push braid back to
create a pucker.
• At pucker use a
screwdriver to
open braid.
• Bend heating cable and
work it through opening
in braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Notch core.
• Peel bus wire from core.
• Score core between bus
wires at inner jacket.
• Bend and snap core.
• Peel core from bus wire.
• Remove any remaining core
material from bus wires.
• Pull braid tight to make pigtail.
BTV, QTVR
6 1/2 in
(165 mm)
1/4 in
(5 mm)
Go to Step 6
4 / 10

Publicidad

loading

Este manual también es adecuado para:

Raychem jbm-100-a6