Connect Power - GE PCR06BATSS Manual De Instrucciones

Ocultar thumbs Ver también para PCR06BATSS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LEVEL
3
• Use an adjustable wrench to turn the leveling
legs and raise or lower the product.
• Adjust carefully; the product should be level
and plumb with cabinetry, and should align with
adjacent toekick height.
Turn Right to Lower
Turn Left to Raise
If you skipped Step 2:
• Select the hinge cover marked "R" or "L",
depending on door swing.
• Peel backing off the tape inside the decorative
hinge cover. Press and snap into position.
49-60466-3
Installation Instructions

CONNECT POWER

4
• Connect power cord plug to a properly grounded
receptacle.
• Make sure power is on by opening the door to
see if interior light turns on.
SLIDE PRODUCT INTO THE
5
CUTOUT
• Carefully slide the unit into the opening. Be
careful not to entangle power cord.
• Make certain that the door protrudes 1" beyond
the surrounding cabinets.
• Check again to be sure the unit is level.
SET TEMPERATURE
6
CONTROLS
• The temperature controls are preset. Refer to the
Temperature Control section for more information.
Allow 24 hours for temperature to stabilize.
13
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pcr06watss

Tabla de contenido