Coloque el carril inferior (cont.)
Coloque el carril inferior de manera que la separación entre cada pared y los
extremos del carril inferior sean iguales.
Fije provisionalmente el carril inferior al reborde con cinta de enmascarar.
Marque el reborde a lo largo del borde frontal del carril inferior con un lápiz de
mina blanda.
3.
Mark the Wall Jambs
Tapered Wall Jamb/Montant du mur conique/Jamba mural angular
Pencil
Level
Crayon à papier
Niveau
Lápiz
à bulle
Nivel
Wall Jamb
Montant du mur
Jamba mural
Position a wall jamb against the wall directly over the bottom track with the
shorter leg facing out. The wall jamb should sit flat against the wall.
Position the tapered end against the base of the shower wall.
Slide the wall jamb down over the bottom track until the wall jamb and bottom
track are fully engaged.
IMPORTANT! The wall jamb must sit flat on the bottom ledge. If your ledge has a
curve in the corners at the side wall, it may be necessary to shape the bottom end of
the wall jamb with a file.
Use a level to plumb the wall jamb vertically.
Using the pre-drilled screw holes as a guide, mark the hole locations on the wall.
Repeat the procedures with the second wall jamb.
Remove the bottom track and wall jambs.
Marquer les montants du mur
Positionner un montant du mur contre le mur directement sur le rail inférieur
avec le pied le plus court vers l'extérieur. Le montant du mur devrait bien reposer
à plat contre le mur.
Positionner le côté biseauté contre la base du mur de douche.
Glisser le montant du mur sur le rail inférieur jusqu'à ce qu'ils soient
complètement engagés.
1063220-2-G
Tapered Wall Jamb
Wall
Montant du mur conique
Mur
Jamba mural angular
Pared
Tapered end down.
Extrémité conique vers le bas.
Lado angular hacia abajo.
Inside of Bath/Shower
Intérieur de baignoire/douche
Interior de la bañera/ducha
10
Bottom Track
Rail inférieur
Carril inferior
Sterling