York JBK 50 BGY Instrucciones De Instalación página 17

Unidades split cassette bomba de calor
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
Make sure the correct poles
are connected on both units
(Fig. 12)
Panel installation.
1. Position the panel on the indoor unit,
positioning the corner of vein motor in
the indoor unit piping corner.
2. Installation of the decorative panel:
(1) From the tab located on the other side
of the vein motor of the decorative panel,
hang the supplied support temporarily.
(2 positions)
(2) Also hang the two remaining tabs tem-
porarily. Be sure to avoid the vein motor
cable from sticking to the filler material.
(3) Insert and tighten the 4 hexagonal
screws on the right, aprox. below the
PIPES
2
VEIN MOTOR
3
4
INDOOR UNIT
CEILING
AIR DISCHARGE
SUPPORT
FILLING MATERIAL
FRONT PANEL
Fig. 12
GB
tabs. (The panel will rise 15 mm.)
(4) Adjust the panel by turning in the direc-
tions indicated in Fig. A, so as to com-
pletely cover the opening in the ceiling.
(5) Tighten screws until the distance be-
tween the indoor unit and the panel is
about 5-8 mm.
1
TAB
2
17

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido