Electrical Connections; Wiring Diagrams For Connecting To The Electrical System - GMP GM 110 PRO Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

E
C
LECTRICAL
ONNECTIONS
WARNING: a 4-wire three-phase distribution system is required for the three-phase input connection.
The UPS must be connected to a power supply line made up of 3 phases + neutral + PE (protective earth) of TT, TN
or IT type. Therefore, the phase rotation must be respected.
Optional TRANSFORMER BOXES to convert the distribution systems from 3 wires to 4 wires are available.
W
IRING DIAGRAMS FOR
NOTE: for the following diagrams, in cases of single-phase connections on the input line, instead of 3P=N, please read
P+N.
Note: For three-phase connections, the transformer must be suitably sized to operate off the bypass
C
ONNECTING TO THE
UPS with no variation of the neutral arrangements
UPS with galvanic isolation on input
UPS with galvanic isolation on output
- 68 -
E
S
LECTRICAL
YSTEM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gm 112 proGm 115 proGm 120 pro

Tabla de contenido