Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

P
OWERING ON FOR THE
 If present, set the "1/0" switch to "1" and wait for a few seconds. Check
that the display is turned on and the UPS enters "STAND-BY" mode.
Check that no error messages appear indicating that the input cables do not respect the correct cyclic phase sense
(for three-phase input only). If error messages appear, perform the following operations:
Switch off the UPS by moving the "I/0" switch to "0" (if present), and open all the input and output disconnecting
switches.
Wait for the display to go off.
Open the battery fuse holders.
Open all the protective devices upstream from the UPS
Remove the panel covering the input terminal board
Correct the position of the input wires so that the phase direction is respected.
Close the panel again
Repeat the power-on operations including the "preliminary operations"
 Press
to enter the start menu. Choose Yes when prompted to
confirm. Press
to confirm and wait for a few seconds. Check that the
UPS is set with the load powered by the inverter.
 Open the input switch (SWIN) and wait for a few seconds. Check that
the UPS goes into battery-powered mode and that the load is still
powered correctly. A beep should be heard approximately every 7
seconds.
 Close the input switch (SWIN) and wait for a few seconds. Check that
the UPS is not in battery-powered mode and that the load is powered
correctly by the inverter.
 To set the Date and Time, access menu 8.6.7 (see "Display menus").
Use the up/down arrows (↑↓) to set the desired value and then confirm
with the
key to move to the next field. To save the new settings, go
back to the previous menu by pressing the
F
T
IRST
IME
key.
- 82 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gm 112 proGm 115 proGm 120 pro

Tabla de contenido