Complete Installation
You have completed your panel installation.
For Onsite Factory Commissioning, call Lutron Technical Support and select Startup to schedule a field service
visit. Allow for 10 working days between day of call and scheduled visit.
If you purchased Telephone Startup (LCP128 only), stop here and complete the Control Location, Panel, and
Control Station Tables that are located in the back of the Setup and Operation Manual. Once the tables are
complete, call Lutron Technical Support and select Startup. Please call 24 hours prior to desired system startup.
In the U.S., Canada, and the Caribbean: 1.800.523.9466
In Mexico: +1.888.235.2910
In Europe: +44.207.702.0657
In Asia: +65.6220.4666
In Japan: +81.355.758.411
In all other countries: +1.610.282.6701
Remove Bypass Jumpers
A. After all load wiring has been checked, turn circuit
breakers OFF.
B. Remove and store the bypass jumpers for possible
future use.
C. Turn circuit breakers ON.
Caution! Reuse the bypass jumpers whenever
work is being done on a load. Damage caused
by short-circuits and miswiring is not covered by
the product warranty.
Danger! Feed-through panels, such as GP4,
may be fed by multiple circuits. Locate and lock
each supply breaker in the OFF position before
removing the bypass jumper.
Warning! Confirm that load types were
correctly assigned. Some loads may be
damaged if dimmed, especially certain
electronic transformers and electronic ballasts
and motors.
Panel installation, control station wiring, and load activation are now complete.
Next Step: Refer to the Setup and Operation Manual to set up the functions and operation of the panel.
18 Installation Guide for Dimming Panels
Extraction tool
Bypass jumper
R