Powerware 9125 Guia De Instalacion página 14

Ocultar thumbs Ver también para 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

P30 Installation Guide
8
5.
Place the UPS cabinet horizontally so that the left end of the unit is accessible (see
Figure 11).
Figure 11. Installing UPS Pedestals with Two Cabinets
6.
Place the EBM or PDM cabinet upside down so that the right end of the unit is
accessible (see Figure 12).
7.
Position two of the pedestals over the edge of each cabinet so that the weight of the
unit is evenly distributed. Secure the pedestals with the screws provided in the
accessory kit.
8.
Carefully position the cabinets upright with the air vents at the top (see Figure 13 or
Figure 14).
®
Powerware
9125 (9910 P30) Installation Guide for IBM
Figure 10. Pedestals with One Cabinet
Figure 12. Installing EBM (or PDM) Pedestals
Air Vents
Figure 13. Pedestals with Two Cabinets
Applications S 164201544 Rev A Final 29-Jun-2004
®
Air Vents

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910 p30

Tabla de contenido