Overhead Rigging; Control Panel - Briteq BT-METEOR Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH

OVERHEAD RIGGING

 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
 Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed at least 50cm from surrounding walls.
 The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
 Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
 Always use a certified safety cable (number 3 on the picture) that can hold
12 times the weight of the device when installing the unit. This secondary
safety attachment should be installed in a way that no part of the installation
can drop more than 20cm if the main attachment fails.
 The device should be well fixed; a free-swinging mounting is dangerous and
may not be considered!
 Don't cover any ventilation openings as this may result in overheating.
 The operator has to make sure that the safety-relating and machine-
technical installations are approved by an expert before using them for the
first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
A. Holes to fix the special omega clamp (included)
B. Holes to fix an optional safety cable
HOW TO SET UP THE UNIT

CONTROL PANEL:

1. DISPLAY shows the various menus and the selected functions.
2. BUTTONS
[MODE]
To select the programming functions
To go backward in the selected functions
To go forward in the selected functions
[ENTER]
To confirm the selected functions
3. MAINS FUSE: this fuse only protects the electronics of the projector,
mains input/output (7) is not fused.
4. MAINS INPUT / OUTPUT: with PowerCON
supplied mains cable here, you can daisy chain several units, up to max
16A. Input and output are connected to each other without any fuse.
Hint: Please check our website for special cable assemblies that contain both power (3x1.5mm² with
Neutrik PowerCON
3m, 5m and 10m, very convenient!
5. DMX IN/OUTPUTS: used for DMX512 linking, you can use good quality balanced signal cables with 3pin
XLR-connectors.
BRITEQ
®
®
) and balanced signal (XLR 3pin) in one cable. Different lengths are available: 1.3m,
®
sockets, connect the
3/74
USER MANUAL
BT-METEOR

Publicidad

Tabla de contenido
loading

Tabla de contenido