Overhead Rigging - Briteq BT-STAGEPAR 6in1 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
DESCRIPTION:
PROJECTOR
1. FILTER FRAME: can be used for all kinds of optional
filters, like frost filters (to make the beam wider).
2. DOUBLE BRACKET: with knob to fasten the unit in
the desired position and a mounting hole to fix a
mounting hook. As it is a double bracket, it can also be
used as a floor stand.
3. MAINS cable: to power the unit.
4. DMX INPUT: 3pin male XLR-connector used to
connect the projector with the DMX controller or with
the previous unit in the DMX chain.
5. DMX OUTPUT: 3pin female XLR-connector used to
connect the projector with the next unit in the DMX
chain.
6. Fuse holder: always replace a damaged fuse with a
fuse of the same type and electrical specifications!
(250V 2A slow blow)
7. DISPLAY shows the various menus and the selected functions.
8. DOWN button: to lower the values shown on the display.
9. UP button: to increase the values shown on the display.
10. ENTER button: used to confirm your choice or to enter the setup mode of a function.
11. MODE button: used to browse the different functions in the menu

OVERHEAD RIGGING

 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
 Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed at least 50cm from surrounding walls.
 The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
 Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
 Always use a certified safety cable that can hold 12times the weight of the device
when installing the unit. This secondary safety attachment should be installed in a way
that no part of the installation can drop more than 20cm if the main attachment fails.
 The device should be well fixed; a free-swinging mounting is dangerous and may not
be considered!
 Don't cover any ventilation openings as this may result in overheating.
 The operator has to make sure that the safety-relating and machine-technical
installations are approved by an expert before using them for the first time. The installations should be
inspected every year by a skilled person to be sure that safety is still optimal.
BRITEQ
®
3/55
OPERATION MANUAL
BT-STAGEPAR 6in1

Publicidad

Tabla de contenido
loading

Tabla de contenido