Door Adjustment - Subzero PRO 48 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
Alignment

DOOR ADJUSTMENT

To make adjustments, remove door and door stop, then
slightly loosen the two upper hinge screws. Use the Allen
wrench provided to turn adjustment screw to adjust hinge.
Refer to the illustration below. Reinstall door and check
alignment. Repeat until door is properly aligned.
When adjusting doors, verify the hinge
IMPORTANT NOTE:
tab continues to engage the door light switch. Refer to the
illustration below.
HINGE
PIN
CABINET
HINGE
Door removal.
HINGE
SCREW
ADJUSTMENT
SCREW
LIGHT
SWITCH
Hinge adjustment.
DRAWER ADJUSTMENT
Vertical adjustment
|
Loosen the three mounting screws.
Refer to the illustration below. Using a
adjustment bolt clockwise to raise and counterclockwise to
lower. Tighten screws, then reinstall drawer and check align-
ment. Repeat until drawer is properly aligned.
Horizontal adjustment
|
Loosen the front drawer slide
screw. Refer to the illustration below. Adjust the front
retainer right or left, then tighten screw. Next, lift up on
the rear retainer and shift forward or backward to maintain
alignment with front retainer. Each set of holes will adjust
1
alignment by
/
"
.
(.8)
32
MOUNTING
SCREW
ADJUSTMENT
BOLT
Vertical adjustment.
7
/
" wrench, turn the
16
REAR
RETAINER
SLIDE
SCREW
FRONT
RETAINER
Horizontal adjustment.
|
subzero.com
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Icb648pro

Tabla de contenido