Technical Data - Grohe BAULOOP 19 592 Manual De Instrucciones

Tabla de contenido

Publicidad

Application
Operation is possible in conjunction with:
- Pressurized storage heaters
Operation is not possible with:
- Low-pressure storage heaters
(displacement water heaters)

Technical data

• Max. flow
- Spout
- Handshower
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit with pressure reducing valves
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
- Scalding protection possible by fitting a handle rotation
stop (see replacement page 2, order no. 46 375).
• Water connection
Notes
• Installation of backflow protection must comply with local
codes and regulations.
• An access panel must be provided for access to diverting
unit and hose connections.
• Major pressure differences between cold and hot water
supply should be avoided.
Installation
Layout dimensions to establish centers and proper clearences,
see dimensional drawing page 1.
Flush piping system prior and after installation of faucet
thoroughly!
Installing faucet body, see fig. [1].
1. Fit faucet body (A) with mounting set (B).
2. Fit adapter (C).
Spout, see fig. [2].
1. Place the O-ring (D1) on the tub deck and insert the
spout (D) from above.
2. Secure the spout with the mounting set (E).
3. Install the diverter (F) to the spout, gently guiding the lift rod
assembly (G) up through the center of the spout (D).
4. Tighten the lift rod knob (H) to lift rod assembly (G).
Handshower, see fig. [3] and [4].
1. Install the escutcheon (J) onto the guide (K), see fig. [3].
2. Install the guide (K) through the mounting surface, insure
the escutcheon washer (K1) is in place.
3. Secure with mounting set (L).
4. Insert shower hose (M) through guide (K) from below.
5. Screw tapered nut (N) onto shower hose (M).
6. Insert seal (N1) into the tapered nut (N) and screw hand
shower (O) into tapered nut (N).
7. Install shower hose (M) with hose (P), see fig. [4].
approx. 28 l/min or 7.2 gpm/45psi
max. 9.5 l/min or 2.5 gpm/45psi
14.5 - 72.5 psi
cold - Right hand
hot - Left hand
English
Connect the faucet, see fig. [4] and [5].
The hot water supply should be connected on the left, the cold
water supply on the right side.
Insure the supplied washers are used for all connections.
Open cold and hot water supply and check connections
for leakage!
Operation
- Lever
Pull lever
Press lever down
7.25 psi
Turn lever right
Turn lever left
- Diverter
145 psi
Pulling the lever will release water supply.
232 psi
Water will emerge from the bath spout first.
176 °F
Pull diverter knob
Press diverter knob
Flow is diverted automatically from shower outlet to bath spout
when the mixer is turned off.
Maintenance
Inspect and clean all parts, replace as necessary and grease
with special grease.
Shut off cold and hot water supply!
I. Replacing the cartridge, see fig. [6].
1. Lever out plug (Q).
2. Loosen set screw (Q1) with 3mm allen wrench and pull off
lever (R).
3. Unscrew cap (S).
4. Remove screws (T).
5. Replace complete cartridge (U).
Assemble in reverse order.
Observe the correct installation position.
Make sure that the cartridge seals engage in the grooves on
the housing. Fit screws (T) and tighten evenly and
alternately.
II. Check valve, see fig [4].
1. Disconnect hose (P).
2. Remove check valve (V).
Assemble in reverse order.
III. Unscrew and clean flow control (13 905), see page 2.
Replacement parts, see page 2 ( * = special accessories).
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.
= open (water flow)
= closed
= cold water
= hot water
= to divert flow from bath spout to
shower outlet
= to divert flow from shower outlet to
bath spout
4

Publicidad

Tabla de contenido
loading

Tabla de contenido