Friedrich M24YJ Manual De Instalación página 22

Ocultar thumbs Ver también para M24YJ:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

22
- Replace the valve caps at both gas and liquid
side service valves and fasten them tight.
This completes air purging with a vacuum pump.
- Replace the pipe cover to the outdoor unit by
one screw
Now the air conditioner is ready for test run.
Settlement of outdoor unit
- Fix the outdoor unit with a bolt and
nut(ø10mm).
- When installing on the wall, roof or rooftop,
anchor the mounting base securely with a
nail or wire assuming the influence of wind
and earthquake.
- If the vibration of the unit is transmitted to the
pipe, secure the unit with an anti-vibration
rubber.
Bolt
Tubing connection
Evaluation of the performance
Operate the unit for 15~20 minutes, then
check the system refrigerant charge:
- Measure the pressure of the gas side service
valve.
- Measure the air temperature from inlet and
outlet of air conditiioner.
- Ensure the difference between the inlet and
outlet temperature is more than 8°C.
- For reference; the gas side pressure at opti-
mum condition is shown on table (cooling)
The air conditioner is now ready to use.
Discharge air
Outside
Refrigerant
ambient
TEMP.
R-22
35°C (95°F)
R-410A
35°C (95°F)
*The feature can be changed according a type of
model.
!
NOTE
If the actual pressure is higher than
shown, the system is most likely over-
charged, and charge should be removed.
If the actual pressure are lower than
shown, the system is most likely under-
charged, and charge should be added.
Inlet temperature
Discharge
temperature
The pressure of
the gas
side service valve.
4~5kg/cm
2
G
(56.8~71.0
P.S.I.G.)
8.5~9.5kg/cm
2
G
(120~135 P.S.I.G.)

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

M30yjM36yj

Tabla de contenido