CA
AUTION! Always kee
du
uring the filling proc
up
p or discharge.
Trouble
Shooting
The following
"Trouble Shooting" g
event you enc
counter abnormal ser
WA
ARNING! DO NOT op
Ret
turn it to the place of p
com
mpromise the integrity
an E
Explosion Proof moto
(UL
L listing).
WA
ARNING! Be certain a
any
y service or maintenan
IMP
PORTANT! When pe
very
y important you take
the
SV fluid.
1)
Maintaining the pur
system is assemble
fluid. Breaking the
contamination.
2)
After dispensing DE
making sure it is po
remaining in the noz
the nozzle.
3)
DO NOT lay the dis
contaminate the noz
4)
Standard threads o
sealant; if your pum
appropriate thread s
5)
Use new latex glove
as possible to reduc
pump, hose, and co
6)
To minimize the am
service, turn the pu
the fluid in the hose
drained from the sy
7)
DEF crystallizes wh
the amount of time
(pump, hose, meter
8)
After repairs have b
entire dispensing sy
This purges the sys
entered the system
system using appro
to the drum or tote,
sealed system to b
p the nozzle in contac
cess to minimize the p
guide is provided to of
rvice from your Tuthill
en or attempt to repa
purchase for service.
y of the Explosion Pro
or) and will void any ex
all power to the pump
nce.
erforming diagnosis
e the necessary step
ity of DEF is critical; a
ed, it must remain sea
e seal on the system
EF be certain to drain
ointing downward whe
zzle tip and exposed
spensing nozzle on th
zzle tip as this can co
n the SV pump are B
mp was special ordere
sealant for the fluid yo
es and work in as clea
ce the risk of airborne
ontainer.
mount of fluid returning
ump off , and open th
e. Pull the hose down
ystem. When the flow
hen exposed to air; th
the DEF wetted comp
r, and nozzle) are ope
been completed and
ystem by pumping 5 –
stem of air, and insure
are washed out. Dis
oved DEF handling pr
or use it in a vehicle.
be opened will requi
7
ct with the container b
possibility of static ele
ffer basic diagnostic a
product.
ir the motor on your T
Opening the motor c
oof construction (if equ
xisting warranty and c
p is turned off prior to
and repairs to a SV
ps to guarantee the
as such, it is imperativ
aled to insure the inte
m can lead to fluid
all the fluid from the
en stored in the nozzle
to air will crystallize a
e ground or any surfa
ompromise the purity
SPP style and require
ed with NPT threads, u
ou are pumping.
an and dust free an e
e contaminants enteri
g to the storage tank p
e nozzle into a conta
n to maximize the amo
w has stopped, close t
erefore, it is desirable
ponents in the deliver
en.
the system reassemb
– 10 gallons of DEF th
es any impurities that
spose of the DEF use
rocedures; do not retu
Any repair requirin
ire this procedure!
being filled
ectricity build
assistance in the
Tuthill pump.
case can
uipped with
certification
performing
V pump, it is
purity of
ve once the
grity of the
nozzle,
e boot. DEF
and can plug
ace that may
of the DEF.
e no special
use the
environment
ng the DEF
prior to
iner to drain
ount of fluid
the nozzle.
e to minimize
ry system
bled, flush the
hrough it.
may have
d to flush the
urn the fluid
ng the