Setting Up For Installation - Dalla Corte MAX Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

WARNING
Installation must be carried out
in compliance with laws in force,
following the manufacturer's
instructions and by qualified
personnel only.
Wrong installation can harm
persons, animals and objects.
The manufacturer cannot be held
responsible for any damages
caused by wrong installation.
24 |

Setting up for installation

You must place the grinder on a stable bearing surface (20 X 40 cm) next to the espresso machine at a
height of 70 cm. Install a 10-16 amp single-phase power socket compliant with local laws.
After unpacking the appliance, make sure it is undamaged and no parts are missing. If you are in any
doubt, do not use it.
Do not leave packing elements within reach of children, since they are potentially dangerous.
Check that technical data on the identification plate match with those of the installation place before
plugging the appliance into the power system. If you need to replace the power cable, replace it with
a cable that has been recommended by the manufacturer.
Bearing Surface

Publicidad

Tabla de contenido
loading

Tabla de contenido