Kohler K-7302 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-7302:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Apply plumbers putty.
Spout
Body
1. Install the Valve Yoke
Apply a bead of plumbers putty or other sealant around the
underside of the escutcheons and spout body according to the
manufacturer's instructions.
Place the valve yoke through the lavatory and thread the
escutcheons to the valve bodies. Leave about 3/8" (1 cm) of
exposed threads in front of the escutcheons.
Remove any excess sealant.
Kohler Co.
3/8"
(1 cm)
Valve Body
3
Escutcheon
111290-2-BC

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-8040K-8046

Tabla de contenido