Installation
3. position the base side-to-side and front-to-back so
that the rail assembly is plumb. level the base plate
- shims may be required under the base in order to
obtain a level condition. Mark the position of the
base hold down bolts through the holes in the base.
4. Move the base aside to allow drilling for 3/8"
expansion bolts, 2" long. Move the base over the
bolt holes and recheck for level and plumb. Install
expansion bolts.
5. place tube coupler in position in each rail pipe.
position another assembled rail section over
the couplers and secure the wall bracket to the
rail section and the side of the basin. attach the
attachment brace to the lower rail section.
6. Continue adding rail sections per step 5 until the
desired rail height is achieved. If a section less
than 48" is needed, either cut that length off the
bottom of the rail section or procure a 12" or 24"
preassembled section.
7. once all rail sections have been installed and the
rails aligned, install discharge pipe as required by the
particular job specifications. tighten all fasteners.
NOTICE: discharge pipe and guide rails must be
plumb and parallel regardless of the number of rail
sections used.
Mo unting Cover and Component Rail
Pieces
1. set concrete cover with hatch opening in position
over basin.
2. Fasten the upper guide rail bracket to the side of the
basin cover opening using appropriate fasteners.
3. place the base elbow on the floor of the basin and
position it side-to-side and front-to-back so that
the rails will be plumb and aligned with the upper
bracket. level the base - shims may be required
under the base in order to obtain a level condition.
Mark the position of the base hold down bolts
through the holes in the base. Figure 2 and 3 show
the typical arrangement of system components.
4. Move the base aside to allow drilling for 3/8"
expansion bolts, 3" long. Move the base over the
bolt holes and recheck for level and plumb. Install
expansion bolts.
5. place guide tubes in position between the upper
guide rail bracket and each base elbow rail post.
Mark tubes for correct length and trim to fit. If total
rail length is more than 15 feet, procure and attach
an intermediate bracket to the basin wall at the
midpoint of the rails.
6. plumb and square the entire rail system. tighten all
fasteners appropriately.
7. Install discharge pipe, check valve and gate valve, as
required by the particular job specifications.
For parts or assistance, call Jung Pumpen Customer Service at 1-800-642-5930
7"
12.75"
4"
Figure 2: 1-1/4" and 2" System Components
8.125"
Figure 3: 4" System Components
4
17"
7.125"
10"
15.75"
12"