Power Supply; Checking Battery Status; Battery Charger; High Voltage Indicator - Circutor MI-20KVe Guia Del Usuario

Megóhmetro alta tensión
Ocultar thumbs Ver también para MI-20KVe:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Power supply

Internal rechargeable 12 V - 7 Ah sealed lead acid battery.

Checking battery status

Battery measurement can be performed without interrupting high-voltage generation, which will provide a better evaluation of
the battery status, by pressing the Battery Icon Key/ during the measurement. So, the battery test is performed under
actual consumption conditions and, for long lasting measurements, (i.e. Polarization Index), the evolution of battery status can
be checked without affecting the measurement. The meter pointer should stop over the blue zone. If the pointer stop over the
red zone this means that the battery is discharged and shall be charged.

Battery charger

This equipment has an intelligent built-in circuit that controls the battery charge and doesn't allow the equipment to operate
during the charging process. In order to charge the battery, follow this procedure:
Verify that the ON/OFF0 switch is switched off.
Connect the equipment to mains of 100 - 240 V∼ with power cord at the Power Input! of the equipment. After a while,
the luminous indicator LED. will blink alternatively in green and red during one second, while the charger verifies the
initial condition of the battery to select the optimised parameters of the charge.
The following chart summarizes the meaning of LED luminous indications:
Green and red flashing alternatively
Permanent red
Flashing red
Permanent green
Flashing green
Note: The battery looses part of its charge while being stored. Thus, before using the insulation tester for the first time, or
after a time being out of use, the battery should be recharged.

High voltage indicator

El led , señala la presencia de alta tensión en los bornes durante la medición y aún después de oprimida la tecla de
STOP2, se mantiene encendido hasta que el proceso de descarga de los potenciales almacenados se haya completado.
Por razones de seguridad, los terminales de tensión del equipo no deben ser tocados hasta que el led ALTA TENSIÓN,
no se haya apagado automáticamente.
Test of the initial condition of the battery when plugging the mains, during
one second.
Battery under charge.
Charging current is less than normal.
The charging process has been successfully finished. Battery OK.
The charging process has finished, nevertheless the battery hasn't received
the complete charge.
19

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido