Completing Installation of the Wallbox Power Module with DALI Control Unit:
Wallbox
Step 1: Grasp the top corners of the
wallplate and pull forward to detach it
from the wallbox power module.
Mounting Screws
Step 2: Use the screws provided to
mount to the wallbox.
Note: When mounted in the wallbox, the
QS Link cable and terminal block should
remain separated from the line voltage/
mains cables.
Step 3: To snap the wallplate on, rest
the top of the wallplate in the grooves at
Wallbox Power
the top of the unit and press firmly at the
Module
bottom corners to secure.
Step 4: Turn on circuit breaker and check
LUTRON
that it does not trip. For any feed circuit
Wallplate
Status LED
Default Scene Button
that trips, locate the short or resolve the
wiring problem before proceeding.
Step 5: Use Default Scene Button:
To test the lights or control the lights
when the WPM is not connected or
communicating with the system, use the
default scene button. The LED will toggle
on/off following the local press on/off of
the default scene button.
Wallbox Power Module Installation and Operation Guide 6
®