Descargar Imprimir esta página

Eaton xChargeIn Instrucciones De Instalación página 11

Poste
Ocultar thumbs Ver también para xChargeIn:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
Floor-mounted column – Installation Manual
Safety instructions
WARNING!
!
Not observing the safety instructions can result in risk of death, injuries and dam-
age to the device! The manufacturer assumes no liability for claims resulting from
this!
Electrical hazard!
The installation, commissioning and maintenance of the charging station may
only be performed by correctly trained, qualified and authorized electricians
who are fully responsible for the compliance with existing standards and in-
stallation regulations.
Observe the instructions given for selecting the location and the construction-
al requirements!
If the specifications for the location are not observed, this can result in death,
serious physical injury or equipment damage if the corresponding precaution-
ary measures are not met!
Use of this manual
This installation manual is intended for qualified personnel only
This manual is a supplement to the "Installation Manual" of the charging station. The infor-
mation and instructions in the manual about selecting the location, installation and connec-
tion of the charging station must be adhered to.
Intended use
A floor-mounted column for free-standing installation in inside or outside areas is available as
an alternative to mounting the charging station on a wall.
Depending on the design and number of charging stations the relevant number of empty
pipes and connection cables should be taken into consideration in the concrete foundation.
If the charging station is installed with a plug-in power supply line (e.g., for demonstration
purposes), you should ensure that there is sufficient tension relief and edge protection for the
power supply line.
The respective national regulations must be observed with regard to the installation of the
floor-mounted columns.
Weight (without charging station):
2
Persons who, due to their special training, expertise and experience as well as knowledge of current standards,
are able to assess the work performed and the possible hazards.
Floor-mounted column – Installation Manual, v4.00, 90333
15,0 kg (V1/V2)
19,2 kg (V3)
2
.
11

Publicidad

loading