Electrical Requirement - Teka TG1 80 Manual De Instrucciones

Congelador vertical
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

gasoline, away form Freezer.
Failure to do so can result in death, explosion, fine or burns.
·To ensure proper ventilation for your Freezer, allow for 200mm
space on each side between walls, 200mm space between back of
your Freezer and the wall, and 300mm space between counter top
and the roof or ceiling.
· If you are installing your Freezer next to a fixed wall, leave sufficient
space on the hinge side to allow for the door to swing open.
·Never install your Freezer near heat source and direct sun shins.

ELECTRICAL REQUIREMENT

DO NOT REMOVE GROUND PRONG.
WARNING:
DO NOT USE AN ADAPTOR.
DO NOT USE EXTENSION CORD.
Failure to follow these instructions can result in death, fire or
electrical shock.
Before you move your Freezer into its final location, it is important
to make sure you have the proper electrical connection.
Recommended Earthing Method
A 220~240 Volt /50 Hz AC only 10 ampere fused and properly
earthed electrical supply is required. It is recommended that a
separate circuit serving only this appliance be provided. Use a
receptacle which cannot be turned off with a switch or pull chain. Do
not use an extension cord.
NOTE:
Before performing any type of installation, disconnect the
Freezer from the electrical source. When you are finished, connect
the Freezer to the electrical source and reset the control to the
5

Publicidad

Tabla de contenido
loading

Tabla de contenido