Mosa GE 6000 SX Manual De Instrucciones página 62

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

MAINTENANCE
Maintenance operations on the electricity-generating group prearranged for automatic operation must be carried
l
out with the panel in RESET mode.
Maintenance operations on the installation's electrical panels must be carried out in complete safety by cutting
l
off all external power sources: ELECTRICAL POWER, GROUP and BATTERY.
For the electricity-generating groups prearranged for automatic operation, in addition to carrying out all periodic
maintenance operations foreseen for normal usage, various operations must be carried out that are necessary in
relation to the specific type of use. The electricity-generating group in fact must be continuously prepared for operation,
even after prolonged periods of inactivity.
1. TEST or AUTOMATIC TEST cycle to
keep the generating set constantly
operative
2. Check all levels: engine oil, fuel level,
battery electrolyte,, if necessary top
it up.
3. Control of electrical connections and
cleaning of control panel
Carry out motor oil change at least once a year, even if the requested number of hours has not been attained.
l
ATTENTION
!
MAINTENANCE GENERATING SET WITH AUTOMATIC BOARD
EVERY
WEEK
NO-LOAD
X
X
EVERY MONTH
AND/OR AFTER
INTERVENTION ON
LOAD
WITH LOAD
X
X
X
M
43.1
REV.0-09/05
EVERY YEAR
X

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ge 6000 gsGe 6000 sx-avrGe 6000 gs-avrGe 6500 sxGe 6500 gs

Tabla de contenido