System Components - ITT Goulds Pumps AquaBoost II Instalación, Operación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. System Components

Please review the AquaBoost II components and insure that you have all the parts and are familiar with
their names. Be sure to inspect all components Goulds Pumps supplies for shipping damage.
AquaBoost II:
Note
Standard unit will come with transducer and transducer cable only.
1. AquaBoost II Controller with Integral Pressure Transducer Cable (3AB2, 3AB2W or 5AB2)
2. Pressure Transducer: PRT0100SA1P for 3AB2, PRT0200SA1P for 5AB2
3. Mounting Screws
Warning
DO NOT power the unit or run the pump until all electrical and plumbing connections,
WARNING
especially the pressure transducer connection, are completed. The pump should not be
Hazardous
voltage
run dry. All electrical work must be performed by a qualifi ed technician. Always follow
the National Electrical Code (NEC), or the Canadian Electrical Code (CEC) as well as all
CAUTION
Hazardous
local, state and provincial codes. Code questions should be directed to your local
Pressure
electrical inspector. Failure to follow electrical codes and OSHA safety standards may
result in personal injury or equipment damage. Failure to follow manufacturer's installation
instructions may result in electrical shock, fi re hazard, personal injury, death, damage to
equipment, unsatisfactory performance and may void manufacturer's warranty.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido