Cub Cadet LS 25 CC Manual Del Operador página 9

Máquina rompetroncos
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

16.
Lift and slide the cylinder up to the top of beam and into
the weld brackets. See Figure 3-6.
Cylinder
Weld Brackets
Figure 3-6
17.
Attach the dislodger over the wedge assembly and secure
it to the weld brackets with the hardware removed in step
14. See Figure 3-4.
NOTE: Lift up on the cylinder when installing the hex screws.
NOTE: Once the six hex screws are tightened, there may be
a slight gap between the dislodger and the weld brackets.
This gap is normal.
18.
Reattach the log tray to the control valve side of the beam,
aligning the holes in the tray with the holes in the beam
and re-installing the hardware removed in step 15. See
Figure 3-7.
Beam
Log Tray
Hex Washer
Screw
Figure 3-7
19.
Remove any staples on the bottom of the crate that may
puncture the tires.
20.
Cut the metal strap securing the log splitter to the bottom
of the crate and remove the wood under the engine and/or
any other wood, then roll the log splitter off the bottom of
the shipping crate.
21.
The control handle is shipped hanging from the valve on
the handle link.
22.
Remove the clevis pin and bow-tie cotter pin from the
control handle. See Figure 3-8.
Bow-Tie
Cotter
Pin
Figure 3-8
23.
Rotate the control handle into the operating position and
secure with the clevis pin and bow-tie cotter pin removed
in step 22. See Figure 3-8.
S
ection
Control Handle
Clevis
Pin
2 — A
& S
-U
SSembly
et
p
9

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ls 27 cchp

Tabla de contenido