Installation Instructions - Victron energy VE.Net Blue BPP2 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.3 Installation instructions

Before mounting the BPP, according to the included mounting
instructions, set the jumpers and make the connections according to
how you intend to use the BPP.
2.3.1
VE.Net only
Connect the BPP to the VE.Net network using a standard cat5
cable with two RJ45 connectors (not supplied).
Remove the jumper from J2.
1
Optional
2.3.2
VE.Bus only
Connect the BPP to the VE.Bus system using a standard cat5
cable with two RJ45 connectors (not supplied).
Supply power to J1 (9-70 V).
Ensure that the jumper at J2 is placed.
2.3.3
VE.Net and VE.Bus
Connect the BPP to the VE.Net network using a standard cat5
cable with two RJ45 connectors (not supplied).
Connect the BPP to the VE.Bus system using a standard cat5
cable with two RJ45 connectors (not supplied).
Ensure that the jumper at J2 is placed.
1
Optional
If desired, an external alarm can be connected to the potential free
contact.
1
The BPP can either be powered from VE.Net, or from J1. In order to power from VE.Net, a
device capable of powering the network must be connected. Such devices include the
VE.Net Battery Controller, and the VE.Net Generator Module. When powering from the
network, jumpers must be placed at J11 and J12. When powering from J1, the jumpers can
be removed from J11 and J12 in order to provide complete galvanic isolation from the
network.
– supply power to J1 (9-70 V).
– supply power to J1 (9-70 V).
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bpp2

Tabla de contenido