Flow Chart - Binzel BRS-LC Instructivo De Servicio

Estación de limpieza de la antorcha
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 Transport and installation

7.9 Flow chart

If BRS-LC has injection unit:
Injection
Activate mech.
Approach injection
actuated
position
3/2 directional
valve
corresponds to
OUTPUT
air blast
Stroke = 1
Duration of injection.
User-
WAIT 0.5 s
dependent
OUTPUT
Stroke = 0
WAIT 0.5 s
Leave injection
position
Fig. 11
Flow chart
EN - 16
BRS-LC
Stroke down
ready?
Approach BRS-LC
OUTPUT
OPTION
Air blast
Recommendation
= I
OUTPUT
Clamp
= I
OUTPUT
Cleaning time
user-dependent
WAIT 2 s
min. 1.8 sec.
Stroke down
OUTPUT
Air blast
= 0
OUTPUT
Clamp
WAIT 0.5 s
Option
Subprogr.
Injection
RETURN
Clean
INPUT
No
= I?
Yes
Stroke = I
OUTPUT
Stroke = 0
INPUT
No
= I?
Yes
TIME OUT
OUTPUT
Air blast
= 0
= 0
Check:
Leave BRS-LC
Air pressure, operating
voltage, etc.
RETURN
BRS-LC
No
t > 2 s
Yes
Determine
cause
BAL.0030 • 2019-01-18

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido