Descargar Imprimir esta página

Eaton Neo-Ray Define GYP 122 Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

1
Install shielded cable to accommodate electrical feed point.
Install 1/4-20 tie rods in specified locations as shown on factory
submittal drawings. Cut hole in gypsum board (or other substrate)
as specified on factory submittal drawing (dimensions "Z" & "L ").
NOTE: FSR requires bracing around opening to secure flange.
3
FOR FSR ONLY: Using (2) 8-32 screws from the LED pan assembly,
install aperture guide snugly to ensure housing opening does not
open or close during installation.
5
Draw fixture tight to ceiling using 1/4-20 tie rods through the
appropriate knockouts on fixture housing. Secure with nuts until
flange is snug. NOTE: FSR must be secured with tie-rod.
3
EATON
IL519010EN
Installation instructions
2
LOW
VOLTAGE
DISCONNECT
DIFFUSER
BRACKET
Prior to installing fixture, remove lens, top access plate, and diffuser
bracket. Turn fixture over. Remove screws and carefully lift LED pan
assembly from housing frame, disconnect low voltage connection
and store pan assembly in a safe place.
4
Secure shielded cable to access plate. Reinstall access plate pulling
wiring through housing and lift fixture into cutout.
6
TIE ROD
KNOCKOUT
Wiring should enter fixture housing as shown. Tie rods extend into
housing and are secured with nuts.
ACCESS
PLATE
ACRYLIC
DIFFUSER
POWER
FEED
HEX NUT

Publicidad

loading