Cable Installation - Thuasne MultiComfort II G2 Manual De Utilización

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.5

Cable installation

The hand control unit is factory-assembled clinked to the anti-
traction system on the outside of the main control. If this is not the
case, please fix the cable of the hand control unit as shown in
figure 12.
Fig. 12: traction control for hand
control unit cable
The two coiled cables used for height adjustment
must be positioned diagonally and freely for
connection to the main actuator (figure 13).
Fig. 13: cable from drive for height adjustment
The network cable is lead ex factory downwards
and is coiled one time around over the main drive
(figure 14) and is then led towards the traction
relief at the head part.
Fig. 14: laying network cable
Make sure, that the traction relief applied on the
network cable (figure 15) is lead into the fixation on
the frame (attached ex factory).
Fig. 15: traction relief network cable
The network cable has to be coiled around the u-
shaped holder in that way that the free end
between the network plug and the bed is not lying
on the floor.
If the bed is moved you have to pay attention that
the cable is not coiled to much, to avoid to high
traction.
Fig. 16: cable holder
35

Publicidad

Tabla de contenido
loading

Productos relacionados para Thuasne MultiComfort II G2

Tabla de contenido