Twin-Star International 36WM2383 Manual De Instrucciones Adjunto página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Locate Left Side Panel (E) and Right Side Panel (F),
insert one Wood Dowel (CC) into each of the
pre-drilled holes. Attach to the completed front panel
assembly and Hearth/Base using Bolts (AA) and
Washers (BB) through the pre-drilled holes in the
mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
4. Locate Mantel Top (G) and set out face down on a
non-scratch surface. Attach the Metal "L" Bracket
(EE) to underside of the Mantel/Top (G) as diagram,
tighten Screw (GG) through the pre-drilled holes.
You may want to adjust the position of Metal "L"
Brackets to align with wall studs.
Hardware Used
GG
Screw ø3*14mm
EE
Metal "L" Bracket
5. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 3. Then locate Mantel/Top (G) and lay
fi nished side up on top of completed assembly.
From the inside, attach Mantel/Top (G) using Bolts
(AA) and Washers (BB) through the pre-drilled holes
in the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
Fig. 3
x 10
F
x 10
x 4
Fig. 4
x 4
x 2
Fig. 5
x 7
x 7
x 10
5
BB
AA
AA
BB
CC
GG
EE
G
G
CC
BB
AA
E

Publicidad

Tabla de contenido
loading

Tabla de contenido