Step 5: Carefully remove tape and label wires according to wiring diagram (see Fig 8).
Step 6: Remove wire nuts (SG) and save for new ballast installation.
Step 7: Remove the two screws (SH) holding lamp socket (SC) to (SA).
Step 8: Remove the screw (SF) holding ignitor (SB) to ballast assembly.
Step 9: Remove the screw (SF) and capacitor (SI) to ballast assembly.
Step 10: Connect new ballast assembly by reversing steps 1 through 9.
Red
SG
Ballast
SC
Lamp
Socket
Red
Blue
Blue
SG
Ignitor
SB
SA
White
White
SG
White
SG
120 volts alternating current, 60 hertz.
Input
11
Lowes.com
SI
Capacitor
AB
Photocell
Socket
SG
Fig. 8