6. INSTALL THE UNIT
6.5
I
8'' D
NSTALLING
6.5.2 C
D
ENTRAL
RAW
• Take one end of the 8'' flexible duct and slide it over the duct connector. Secure with
a tie wrap. Carefully seal the connection with UL approved duct tape. Identify the
duct using the blue sticker dot included.
• Attach this duct to the
using tie wrap and duct tape.
6.5.3 R
-
-R
ETURN
TO
Filtered air ductwork (Return side connection)
Same as for Central Draw Point, described in point 6.5.2.
Stale air ductwork (Return side connection)
When performing duct connections, always use approved tools and materials. Respect all corresponding laws and/or safety
regulations. Please refer to your local building code. Use only UL listed duct tape.
• Locate the return air inlet duct at least 2' (0.61 m) upstream (return side) from
furnace / air handler. Locate the take-off duct opening at least 3' (0.9m) from
the filtered air ductwork connection. Proceed as for the filtered air ductwork,
but instead of using the blue dot sticker to identify the duct, use the red dot.
• Attach this duct to the
using tie wrap and duct tape.
(CONT'D)
R
UCTS AND
EGISTERS
P
(
OINT
AS ILLUSTRATED IN
port (see icon on the top of the unit)
FRESH AIR TO BUILDING
(
ETURN
AS ILLUSTRATED IN
EXHAUST AIR FROM BUILDING
(
'
)
CONT
D
S
5.4)
(
'
)
ECTION
CONT
D
S
5.5)
ECTION
!
WARNING
0
port (see icon on the top of the unit)
- 18 -
VJ0026A
Minimum 3'
(0.9 m) from
filtered air
ductwork
connection
Front door
of the unit
RETURN
VJ0027A
Front door
of the unit
SUPPLY
Front door
of the unit