1.General Instructions ................................................... 19
3.Assembly ..................................................................... 21
3.1 Preparation ......................................................................................................................................21
3.2 Base Frame .....................................................................................................................................21
3.3 SE Hot Water Module ......................................................................................................................22
GB
4.2 Water connection ............................................................................................................................26
4.2.1 With circulation line .................................................................................................................26
4.3 Filling and draining ..........................................................................................................................26
5.1 Hot Water Module ...........................................................................................................................27
5.2 Controller .........................................................................................................................................28
6.2 Main Menu 6 - Hot Water ................................................................................................................29
7.Assembly ..................................................................... 31
8.1 Troubleshooting ...............................................................................................................................32
8.2 Maintenance ....................................................................................................................................32
1.General Instructions
Assembly and first commissioning must be
performed by a qualified fitter who assumes the
responsibility for the correct equipment.
When testing the system pressure after
installation, the maximum permitted pressures
must not be exceeded.
Heating side:
Hot water side:
When connecting the drinking water pipes, the
respective valid directives and standards must be
observed (DIN EN 1988, DIN 4753).
The SE 30 hot water module may only be operated
in conjunction with DACHS SE.
18
Note:
When applicating the warm water module SE30 in
systems with galvanised pipings (mixture of noble
and ignoble metals with corrosion in accordance
with the electro-chemical series) it is to be noted
that a sufficient protective layer is in this net pipe
work.
max. 3 bar
max. 10 bar
english