Electrical Connections; Hot Water Module - SenerTec Dachs MSR2 Instrucciones Para El Montaje, Puesta En Marcha Y Manejo

Ocultar thumbs Ver también para Dachs MSR2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5.Electrical Connections

5.1 Hot Water Module

Note:
Feeler lines lead no mains voltage and should not
parallel to live lines be moved (separate transfer).
Otherwise shielded lines (e.g. Type LiYY or LiYCY)
are to move (Fig. 5,1).
GB
Important:
The remaining lengths of the Wiring harness must
be put down single from each other and over-half
the isolation on Buffer storage (Fig. 5.1).
Guide cable harness of hot water module down-
wards behind the base frame (Fig. 5.2) and
through the recess behind the circulation pipe.
(Fig. 5.4).
Guide cable harness of hot water module through
the insulation halves, over the cover insulation
and through rear insulation halves to the control-
ler (Fig. 5.1).
Open the circulation pump and connect L, N, PE
(Fig. 5.3).
connection
circulaton pump
26
cable
No. / color
L
N
2 / blue
yellow/green
P
E
230V- Lines
(SE30/SEplus)
Fig. 5.2: Rear accumulator insulation halves
Fig. 5.1: Cable run on Buffer storage
Fig. 5.2: Cable harness hot water module
1
Fig. 5.3: Electrical connection of circulation pump
english
feeler lines
(SE750/SE30/SEplus)

Publicidad

Tabla de contenido
loading

Productos relacionados para SenerTec Dachs MSR2

Este manual también es adecuado para:

Se30

Tabla de contenido