OBO Bettermann GE 2V VO Instrucciones De Montaje página 23

Unidad portamecanismos sin entalladura de pavimento, con enchufe hembra con toma de tierra doble
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
I nsert the M25 installation pipe (accessory)
max . 5 mm into the service outlet, and fix it
outside, on the floor .
Tip: If screed laying follows, then place the
socket insert loosely into the service outlet for
storage .
Laying the screed
C lose the hinged lid and attach the mounting
cover .
Note: We recommend routing the screed with-
out an additional separation layer . A separation
layer can be used to reduce noise transmission,
although this reduces fixed anchoring of the ser-
vice outlet in the screed .
L ay the screed flush to the top edge of the
mounting cover and work it up to the service
outlet .
EN
23

Publicidad

Tabla de contenido
loading

Tabla de contenido