OBO Bettermann GE 2V VO Instrucciones De Montaje página 24

Unidad portamecanismos sin entalladura de pavimento, con enchufe hembra con toma de tierra doble
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
Performing the electrical installation
R emove the mounting cover and open the
hinged lid .
I nsert strain reliefs in front of the installation
pipe .
I nsert the connection cable for the sockets
and strip it by approx . 150–200 mm .
F ix the connection cable by pushing the
strain relief together .
C onnect the double socket as shown . Also
connect the PE connection of the service
outlet .
B end the separation panel downwards by
90° (1.), insert the double socket in the ser-
vice outlet (2.) and screw it tight (3.) .
Applying the floor covering and adjusting
the height
A pply the floor covering, leaving an expan-
sion joint of 1–5 mm to the device insert .
a nd Adjust the height of the top edge of
the service unit, so that it is flush with the top
edge of the floor covering . To do so, unscrew
the four height adjustment supports accord-
ingly, using a slotted screwdriver .
24

Publicidad

Tabla de contenido
loading

Tabla de contenido