Prepare The Site - Kohler K-1227 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para K-1227:
Tabla de contenido

Publicidad

1.

Prepare the Site

Provide a 1/16" (2 mm) gap between the bath rim
and the framing.
Fournir un espace de 1/16" (2 mm) entre le rebord
de la baignoire et le cadrage.
Provea una separación de 1/16" (2 mm) entre el
borde de la bañera y la estructura de postes de
madera.
Flooring
NOTICE: Adequate floor support must be provided. Consult the roughing-in
information packed with the bath for specific floor loading requirements.
Install adequate floor support.
NOTICE: To ensure a successful installation, it is critical that bath be installed on a
level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
Framing
CAUTION: Risk of property damage. Do not support the bath by the rim. The
bath must be supported by the bath base.
NOTICE: To ensure the bath does not rest on the rim, a 1/16" (2 mm) gap must exist
between the framing and the underside of the rim. When constructing the framing,
take into account the 1/16" (2 mm) gap and the thickness of the finished wall/deck
material. If these factors are not taken into account, the bath will not fit in the
installation area.
NOTICE: If a deck-mount faucet will be installed, plan a space on the deck to
accommodate the deck-mount faucet.
Construct the framing according to the roughing-in information packed with the
bath. Ensure a 1/16" (2 mm) gap will exist between the framing and the underside
of the rim.
Plumbing
NOTE: For through-the-floor drain installations: A drain hole will need to be cut to
accommodate the drain connections. For above-the-floor drain installations: A hole
will not need to be cut.
Position the plumbing according to the roughing-in sheet packed with the bath.
Cap the supplies and check for leaks.
1084204-2-A
6
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1232

Tabla de contenido