Mounting Steps - Lenze E94AZPP04 Serie Instrucciones Para El Montaje

Tabla de contenido

Publicidad

4
Mechanical installation

Mounting steps

A DC−bus connection with regenerative power supply module has to be planned
and dimensioned taking the technical data into account.
How to arrange the devices for operation in the DC−bus connection via the DC
busbars:
Arrange the devices in a row from left to right.
ƒ
Install the supplying device on the left:
ƒ
Regenerative power supply module with assigned mains filter (in a first
row),
Input module (in the following rows).
Install the multi drive axis controllers to the right from the highest to the
ƒ
lowest power (recommendation).
For increasing the braking power also single drive axis controllers can be
ƒ
integrated. For this purpose, these axis controllers have to be equipped
with the optional busbar mounting set (E94AZJAxxx). In order to carry out
multi−supply applications, consult Lenze.
4.3
Mounting steps
So gehen Sie bei der Montage vor:
1. Montageplatte mit M5−Gewindebohrungen gemäß dem
Befestigungsraster vorbereiten.
Beginnen Sie von links mit dem Montagesockel des
DC−Versorgungsmoduls E94AZPNxxxx.
Die Achsmodule nach rechts anreihen, mit fallender Nennleistung.
2. Montagesockel auf die Montageplatte schrauben. Die Schrauben aber
noch nicht fest anziehen.
Verwenden Sie M5−Kombischrauben oder
M5−Innensechskantschrauben mit Unterlegscheibe.
Die Verschraubung darf im Montagesockel max. 7 mm auftragen.
3. Richten Sie alle Komponenten aus.
4. Beim Einsatz von Stromschienen: Stromschienen verbinden.
5. Die Komponenten auf der Montageplatte festschrauben.
Anzugsdrehmoment: 3.4 Nm (30 lb−in).
52
l
EDK94ZPP0364 DE/EN/FR/ES/IT 3.0

Publicidad

Tabla de contenido
loading

Tabla de contenido