Fluidmaster K-400H-021 Guía De Inicio Rápida página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 5: SECURE TANK TO BOWL
A: INSTALL RUBBER WASHERS
Place one rubber washer on each
tank bolt.
B: INSERT BOLTS INTO TANK
Place tank bolts through bottom
holes of tank.
C: SECURE TANK ONTO BOWL
Set tank onto bowl. Place metal
washer and large hex nut on each
bolt under toilet bowl. Using
tool, tighten hex nuts evenly until
tank is snug and does not rock. Do
not overtighten.
Green Tool
12
Rubber
washer
Rubber washer
(Omit for
Tank
Kohler
Bowl
Metal washer
Large hex nut
green
RIGHT
STEP 6:
ADJUST HEIGHT OF NEW FILL VALVE
A: TWIST FILL VALVE TO ADJUST HEIGHT
Top of fill valve cap should measure roughly 3"
above top of overflow pipe when installed.
NOTE:
Increasing height allows
more water to fill in the tank.
Toilets)
®
*Lever Hole
**
The top of the overflow pipe must be a minimum of 1" below tank lever hole.
HOLD
TWIST
LEFT
Do Not Move Lock Ring
Fill Valve Cap
TOP OF FILL VALVE CAP
3"
TOP OF OVERFLOW PIPE
Overflow Pipe
13

Publicidad

Tabla de contenido
loading

Tabla de contenido