Vision TM-1200 El Manual Del Propietario página 5

Ocultar thumbs Ver también para TM-1200:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43
STANDARD / SLOPED CEILING INSTALLATION:
1.
MEASURE LENGTH OF POLE Hold in place and mark length.
Note: As a rule of thumb the projector lens should typically be about 300mm above the top
of the projection screen.
2.
CUT POLE
3.
DRILL HOLES IN POLE
a. Fit drilling jig
b. Use the included Hex key to tighten jig in place.
c. Place jig and pole on the ground. Drill four new holes.
d. Remove jig.
5
TM-1200_manual_en.doc

Publicidad

Tabla de contenido
loading

Tabla de contenido