Valve Assembly - T&S B-2850 Serie Instalación Y Instrucciones De Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

General Instructions
8. Reattach no.9/11 to no.4, making
sure no.6 is in place.
9. Tighten no.7 with a wrench against
sink bottom.
10. Tighten bottom no.16 on both
side no.15 on underside of sink with
a wrench. Also, tighten no.12 on
no.15 assembly.
19
18
17
8
7
16
15
4
12
12
Note: When tightening no.7 and
no.16, make sure that both no.15's
are located at the same height
above sink level. Tighten no.7 and
no.16 before tightening no.19's

Valve Assembly

11. Replace no.20 and no.21 on both
side no.15 and tighten bonnets
sufficiently to seat valve.
20,21
bonnet
12. Remove packing nut/locknut
assembly from both no.20,21.
13. Slip no.22 over each no.20,21.
14. Packing nut and locknut should
be loosely assembled before replacing
into no.20,21. Hand-tighten locknuts
only against no.22. Do not use a
wrench.
bonnet
15
15. Tighten Packing nut down
against lock nut using two wrenches.
Hold lock nut while rotating packing
nut.
16. Attach no.29 to no.20,21 and
place no.33 in the appropriate no.29.
Place no.32 into no.33 and no.29,
then tighten.
29,32,33
15
17. Connect supply lines, turn on
water and check for leaks.
3 1/2
Note: It may become necessary to
tighten bonnets and packing nuts
to stop leakage from outlet or
around spindle assembly.
5
packing nut
locknut
22

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

B-2865 serieB-2990 serieB-2991 serie

Tabla de contenido