sure a capacitive coupling to earth.
-
Apply the probe tips L1/-
conductors (phases) and check whether the external con-
ductor voltage of e.g. 400 V is applied.
-
A clockwise phase sequence (phase L1 before phase L2)
is given, if the green LED „►" of the phase sequence in-
dication
indication
-
A counter-clockwise phase sequence (phase L2 before
phase L1) is given, if the green LED „◄" of the phase
sequence indication
sequence indication
-
The phase sequence test always requires a countercheck
with the probe tips L1/-
ing which the phase sequence must change.
Note:
The phase sequence test can be carried out in an earthed
three-phase mains from 400 V - 900 V, 50/60 Hz (phase to
phase) on. Protective clothing and insulating conditions on site
might impair the function.
8.
Continuity test (figure I)
-
The continuity test must be carried out on system parts
which are free of voltage. If necessary, capacitors have to
be discharged.
-
Apply the two probe tips L1/-
parts to be tested.
-
In case of continuity (R < 100 kΩ), an acoustic signal is
emitted and the yellow LED Ω
-
If a voltage is applied to the test point, the voltage tester
automatically switches over to the voltage test function
and indicates this function.
9.
Resistance measurement (figure J)
-
The resistance measurement must be carried out on sys-
tem parts which are free of voltage. If necessary, capaci-
tors have to be discharged.
-
Short-circuit the probe tips L1/-
the push-button
the kΩ symbol
6
. Display: „OL" stands for a measured value which is
outside the measuring range.
-
The resistance measurement function is active for approx.
10 seconds.
-
Apply the probe tips L1/-
parts to be tested in order to measure resistances from
0.1 kΩ to 300 kΩ.
Note:
If required, it is possible to carry out a null balance with the
resistance measurement function being activated. For this pur-
pose, short-circuit the probe tips L1/-
and hold the push-button
approx. 2 seconds until „0.0" kΩ is shown on the LC display.
10. Diode test (figures K/L)
-
The diode test must be carried out on system parts which
are free of voltage. If necessary, capacitors have to be dis-
charged.
-
Short-circuit the probe tips L1/-
the push-button
the diode symbol
display
-
The diode test is active for approx. 10 seconds.
-
Apply the probe tip L1/-
tip L2/+
ducting-state voltage between 0.3 V and 2 V. In case of a
defective (broken down) diode, a voltage value of approx.
0.0 V will be displayed.
-
In case of a diode tested in non-conducting direction, the
LC display shows „OL".
11. Cable break detector (figure M)
-
The cable break detector is intended for the non-contact
localization of cable breaks on exposed live lines.
-
Switch the voltage tester on by briefly actuating the push-
button
7
on for approx. 10 seconds!). When the device is switched
on, the display shows „0.0".
-
Fully grasp the display handle L2
tor
5
over a live line (e.g. a cable reel or a chain of lights)
from the feeding point (phase) in direction of the other end
of the line.
-
As long as the line is not interrupted, the yellow LED Ω
for continuity is flashing.
-
The point of the cable break has been localized as soon as
the yellow LED Ω
Note:
The cable break detector may grounded power from 230 V,
50/60 Hz (phase to earth) are used. Insulating protective cloth-
ing and site conditions can affect the function.
12. Measuring point/display illumination (figure N)
-
The measuring point illumination
with the probe tips being open by actuating the push-but-
7
ton
of the display handle L2
-
The off automatically after 10 seconds
-
The background lighting of the LC display
automatically by means of a light sensor
13. Battery replacement (figure O)
-
Do not apply voltage to the device when the battery com-
partment is open!
-
Please replace the batteries as soon as the
is shown on the LC display
-
The battery compartment is located on the back of the dis-
play handle L2/+
-
Unscrew the screw of the battery compartment cover and
replace the used batteries by two new micro batteries
(LR03/AAA).
02/ 2019
L
and the
P
light up on the LC display
7
of the display handle L2
and „Ohm" are shown on the LC display
7
of the display handle L2
6
. Display: „OL" V
3
to the anode of the diode to determine the con-
of the display handle L2
M
9
DUSPOL
2
and L2/+
symbol of the phase sequence
L
and the
P
light up on the LC display
2
and L2/+
2
and L2/+
M
2
2
and L2/+
7
of the display handle L2
2
and „diod" are shown on the LC
DC
2
to the cathode and the probe
goes out.
9
6
.
.
digital
®
3
to two external
6
.
symbol of the phase
3
being inverted dur-
3
to the system
for continuity lights up.
3
and L2/+
3
to the system
2
and L2/+
3
and L2/+
9
9
(remains switched
9
and pass the detec-
4
can be switched on
(1 second).
6
N
.
6
.
and press
9
once until
3
and press
9
for
and press
twice until
M
is activated
symbol
8