5. INSTALLATION PROCEDURE
1
Remove the lower cover, and rotate the main device
by 90 degrees.
2
Loosen the two screws.
3
Remove main device from the mounting base.
Main device
Mounting base
4
Use the device mounting screws to secure the
mounting base and back sponge to the wall surface
and connect the wiring.
Device mounting
screws
Mounting base
Device mounting
screws
CAUTION
Be sure to install the main device so that it is parallel
to the ground surface or floor. If it is installed at a tilt, a
malfunction or breakdown could result.
5
Main device
Lower cover
6
Main device
7
Wall surface
8
Back sponge
(Back sponge
is affi xed to the
mounting base by
an adhesive tape.)
4
Connect the relay cable of the main device to the
connector of the mounting base.
Relay cable connector
Fit the main device.
Tighten the screws.
About how to use lock screw.
* A locking mechanism of the rotary prevention
becomes stronger by using an attached lock
screw when the detection area of the detector was
decided.
Mounting base
Relay cable
Hang the
hook of the
main device
rear side.
Mounting base
Lock screw M3 × 8