Operation; Break-In Procedure - Briggs & Stratton Brute 074003 Manual Del Operario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION

OPERATION

Break-In Procedure

Before first use of this equipment, the system must undergo a
break-in operation, as described in this section.
NOTICE
Serious damage may result if the described break-in
instructions are not closely followed.
• This procedure is required before air compressor is put into
service and when check valve or a complete compressor pump
has been replaced.
1.
Make sure ON - OFF switch is in OFF position (see
Figure 7).
Figure 7 - Pressure Switch with ON - OFF Switch
ON - OFF Switch shown
in OFF position
2.
Plug power cord into grounded 120 Volt AC outlet (see
Grounding Instructions on page 9).
8
3.
Open drain valve (rotate fully counterclockwise) to
prevent air pressure build-up in air tank during break-in
period (see Figure 8).
Figure 8 - Drain Valve in CLOSED Position
NOTE: Always drain air tank over a washable surface or in a
suitable container to prevent damaging or staining surfaces.
4.
Pull ON - OFF switch to ON position. Compressor will
start.
NOTE: If you hear leaking air, pull quick connect coupler(s)
back until it clicks to reset coupler valve.
5.
Run compressor for 15 minutes. Make sure drain valve
remain open.
6.
After 15 minutes, close drain valve (rotate fully
clockwise). Air tank will fill to "cut-out" pressure and
compressor will stop.
NOTE: Check oil level in compressor after break-in.
The compressor has completed the break-In procedure and is
ready for normal use.
Drain Valve shown
in CLOSED
position

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Brute 074004

Tabla de contenido