EVBOX WALL BOX Manual De Instalación página 11

Ocultar thumbs Ver también para WALL BOX:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
Part number: 9835663080
EN
2. Install wall dock
Installation advice
Earthing advice
Input
Delivered Power
Gauge
MCB
RCD
Note: In case of a TT or IT electric grid with 230 V from line to line, The wall box must be
installed with 1-phase by connecting the clamps on L1 and N.
Service wiring
Option1:
400 V 3-phase with neutral
For 3-phase use of a Wye-connected secondary,
all three phases (L1, L2 and L3) and neutral must
be connected. Each phase voltage must measure
230 V to neutral.
12
INSTALLATION_WALL_BOX_SOCKET_PSA_B2C_MERGED.indd 12
TN-system
PE-cable
TT-system
Earth electrode installed separately (self-in-
IT-system
stalled)
1-phase
230 V ±10% 50/60 Hz
3-phase
400 V ± 10% 50/60 Hz
16 A 1-phase or 3-phase
32 A 1-phase or 3-phase
C-characteristic (MCB must be selected to match the amper-
age settings of the wall box, considering MCB manufacturer
specifications)
40 A, 30 mA AC type A, high immunity type (for example: HPI,
SI, HI, KV, etc)
400V
230V
230V
230V
L1
L2
L3
N
G
11-9-2019 8:29:42

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido