New Construction – suspended between joists
B11
E
Slide the mounting rails into brackets.
B13
E
Mark position of screws by using holes as a template.
B15
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
B12
D
position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
B14
Drill a hole in the center of each outline.
B16
8
43043-01 01/24/2008
5/8
1/2
Attach the rails onto the screws.
5/8
1/2
1/8" Bit